Where the engineering calls for piers, they can only be checked between boring and concrete.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
Building & Plumbing Commission
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Point Cook covers a mix of ground, from basalt to former swamp and coastal sand, so pier design varies more here than in a uniform basalt corridor. The depth on your drawing is the number that has to be met.
Annotated findings from Bored piers inspections.

2Slab pre-pourThe day before the pour, with steel and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before painting
6WaterproofingAfter the membrane is applied and cured, before tiling
7Pre-handover (PCI)About a week before practical completionInstant online pricing for Point Cook, or contact the booking team.
Under an hour on a typical lot.
There is nothing left to inspect.
No. We report against the drawing; the engineer certifies.
No, it depends entirely on the ground and the engineering.
AS 2870, alongside the drawing issued for your lot.
Yes, everything is visible at that point.