Lock-up inspection in Point Cook

Cladding, roof and doors are on and the plasterer is next. This is the last look at anything structural behind the lining.

  • After roof, cladding and external doors, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Price a Point Cook inspectionAbout a minute, with nothing committed.

Fully licensed & accredited

Stage4 of 7
When to bookAfter roof, cladding and external doors, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Point Cook lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Point Cook builds

Lock-up in Point Cook catches damage done after the frame passed: bracing cut through by a following trade, posi-strut top chords cut, and ducting bent and unsupported.

What we find at this stage in Point Cook

  • Bracing cut through after installation
  • Posi-strut top chord cut, needing the manufacturer consulted
  • Heating and cooling ducts bent tightly and unsupported
  • Frame defects from the earlier report still unrectified
  • Sarking and penetration gaps not sealed
  • Stormwater pipes broken or blocked
Sarking and penetration gaps not sealed, Point Cook
Sarking and penetration gaps not sealed
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Point Cook

Annotated findings from Lock-up (pre-plaster) inspections on Point Cook builds. Client addresses withheld.

Bracing cut through, losing the stability it provides, recorded during a lock-up inspection in Point Cook
Bracing cut through, losing the stability it provides
Posi-strut top chord cut, requiring the manufacturer's rectification, recorded during a lock-up inspection in Point Cook
Posi-strut top chord cut, requiring the manufacturer's rectification
Heating and cooling ducting bent tightly and unsupported, recorded during a lock-up inspection in Point Cook
Heating and cooling ducting bent tightly and unsupported
Frame report defects still not rectified at lock-up, recorded during a lock-up inspection in Point Cook
Frame report defects still not rectified at lock-up

The other stages of a Point Cook build

  1. Bored piers inspection in Point Cook1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Point Cook2Slab pre-pourThe day before the pour, with steel and formwork open
  3. Frame inspection in Point Cook3FrameOnce frame and trusses are up and the roof is on, before sarking
  4. Fixing inspection in Point Cook5FixingAfter mouldings, doors and joinery, before painting
  5. Waterproofing inspection in Point Cook6WaterproofingAfter the membrane is applied and cured, before tiling
  6. Pre-handover (PCI) inspection in Point Cook7Pre-handover (PCI)About a week before practical completion

All construction stage inspections in Point Cook →

Guides

Construction stage guides for Point Cook

All guides →

Book a lock-up (pre-plaster) inspection in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Point Cook: common questions

How does bracing get cut?

A following trade runs a service through it. Bracing provides stability and cutting it removes that, which is why the lock-up check matters even when the frame passed.

What is a posi-strut?

A truss or floor system with an open web. Cutting a top chord changes how it carries load, and the manufacturer has to specify the repair.

Why does duct bending matter?

A tightly bent or unsupported duct restricts airflow, so the system underperforms from the day you move in.

When should I book?

After external doors are hung and before plaster arrives.

Same as pre-plaster?

Yes, the two names describe one point in the build.

Can findings still be fixed?

Easily, which is why the timing matters.