Fixing stage inspection in Point Cook

Mouldings, doors and joinery are in and the painter is next, so anything found now is fixed before paint.

  • After mouldings, doors and joinery, before painting
  • 1 to 2 hours on site
  • Report within 24 hours
Price a Point Cook inspectionAbout a minute, with nothing committed.

Fully licensed & accredited

Stage5 of 7
When to bookAfter mouldings, doors and joinery, before painting
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Point Cook fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Point Cook builds

The item worth catching here is the box gutter overflow. It has to discharge to the atmosphere where you can see it fail, not into the drainage system where a blockage goes unnoticed until the ceiling comes down.

What we find at this stage in Point Cook

  • Box gutter overflow not discharging to the atmosphere
  • Broken and cracked roof tiles
  • Gutters holding construction debris
  • Door jambs and architraves not finishing above floor level
  • Waterproofing membrane left unprotected
Sample findings

Sample defects found during our fixing inspections in Point Cook

Annotated findings from Fixing inspections on Point Cook builds. Client addresses withheld.

Box gutter overflow not discharging to the atmosphere, recorded during a fixing inspection in Point Cook
Box gutter overflow not discharging to the atmosphere
Broken and cracked roof tiles needing replacement, recorded during a fixing inspection in Point Cook
Broken and cracked roof tiles needing replacement
Construction debris left in the gutters, recorded during a fixing inspection in Point Cook
Construction debris left in the gutters
Door jambs and architraves not finishing above floor level, recorded during a fixing inspection in Point Cook
Door jambs and architraves not finishing above floor level

The other stages of a Point Cook build

  1. Bored piers inspection in Point Cook1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Point Cook2Slab pre-pourThe day before the pour, with steel and formwork open
  3. Frame inspection in Point Cook3FrameOnce frame and trusses are up and the roof is on, before sarking
  4. Lock-up (pre-plaster) inspection in Point Cook4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Waterproofing inspection in Point Cook6WaterproofingAfter the membrane is applied and cured, before tiling
  6. Pre-handover (PCI) inspection in Point Cook7Pre-handover (PCI)About a week before practical completion

All construction stage inspections in Point Cook →

Guides

Construction stage guides for Point Cook

All guides →

Book a fixing inspection in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Point Cook: common questions

Why must an overflow discharge to atmosphere?

So a blockage shows itself as water pouring down an external wall rather than backing up into the roof and the ceiling below. Plumbed into the system, the warning disappears.

Is a box gutter riskier than a normal gutter?

It carries more water in a concealed position, so the consequences of a blockage are larger. The overflow is the safeguard.

Worth a separate visit?

If the budget allows. Items caught before paint are cheap.

Which standard?

The Guide to Standards and Tolerances 2015 with the NCC plumbing provisions.

What is excluded?

Appliances are not tested, circuits are not made live, nothing is commissioned.

How long on site?

About two hours for a typical Point Cook home.