The last inspection where the builder carries the cost, and the one that catches the safety items.
A loose balcony balustrade and a leaking sink waste have both come out of Point Cook handovers. Neither is a finish issue, and neither is obvious to an owner walking through with a builder.

Annotated findings from Pre-handover (PCI) inspections on Point Cook builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, with steel and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before painting
6WaterproofingAfter the membrane is applied and cured, before tilingInstant online pricing, or talk to the booking team on 1300 471 805.
On a balcony it is a fall hazard, so it is recorded as a safety item and should be rectified before you accept the property.
Usually not. It is under a cabinet and only shows when the fitting is run, which is exactly what an inspection does.
Immediately. You hold the most leverage before you put your name to practical completion.
Yes. A return visit runs through the list ahead of settlement.
Live circuits, pressure tests, system commissioning, appliance and garage door safety checks, and any concealed area.
Two to three hours typically, and longer again on a double storey.