A pre-handover checklist for a Point Cook home
Including the safety items owners rarely think to test.
In short: Handover here has produced a loose balustrade and a leaking waste. Neither is a finish issue.
Book ahead of the date
A week gives us time to attend and write up, and you time to send the list before signing.
Balustrades
Push on every balcony balustrade. A loose one is a fall hazard and has been found here.
Under the sinks
Run every tap and look underneath. A leaking waste only shows when the fitting is used.
Fittings present
Mirrors, guides and hardware actually installed rather than pending.
Gas and services
Capped where connections are not yet made.
Finishes
Brickwork cleaned, joints caulked, tiles intact.
Written by the Owner Inspections team from inspections carried out in Point Cook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.