Cut bracing and posi-strut chords in Point Cook

Damage done after the frame already passed.

Owner Inspections · Point Cook 3030 · 2026-05-19

In short: A frame that passed inspection can be cut open by the next trade through.

How it happens

A following trade runs a service through a brace or a truss chord because it is in the way.

Why it matters

Bracing provides stability against lateral load. A cut brace is not providing it, and the frame report that passed no longer describes the building.

Posi-strut chords

An open web truss with a cut top chord carries load differently. The manufacturer has to specify the repair, not the site.

Why lock-up catches it

It is the only inspection after the trades have been through and before plaster covers the evidence.

What to do

If you booked frame, book lock-up too. They catch different things.

Written by the Owner Inspections team from inspections carried out in Point Cook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Point Cook

All guides →

Book a building inspection in Point Cook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Point Cook owners ask about this

Is this common?

Common enough that it is one of the reasons lock-up exists as a stage.

Who pays?

The builder, as a coordination issue between their trades.

Can it be repaired?

Yes, to the manufacturer's or engineer's specification.

Would I see it?

Only if you were in the roof space before plaster.