Damage done after the frame already passed.

Point Cook 3030 · 19 May 2026

Fully licensed & accredited

  • Building & Plumbing Commission (VIC) Building & Plumbing Commission
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: A frame that passed inspection can be cut open by the next trade through.

How it happens

A following trade runs a service through a brace or a truss chord because it is in the way.

Why it matters

Bracing provides stability against lateral load. A cut brace is not providing it, and the frame report that passed no longer describes the building.

Posi-strut chords

An open web truss with a cut top chord carries load differently. The manufacturer has to specify the repair, not the site.

Why lock-up catches it

It is the only inspection after the trades have been through and before plaster covers the evidence.

What to do

If you booked frame, book lock-up too. They catch different things.

Written by our local inspection team from work carried out in Point Cook. Licensed building practitioners.

Guides

More new construction stage inspections guides for Point Cook

All guides →

Book a building inspection in Point Cook

Instant online pricing for Point Cook, or contact the booking team.

FAQ

Questions Point Cook owners ask about this

Is this common?

Common enough that it is one of the reasons lock-up exists as a stage.

Who pays?

The builder, as a coordination issue between their trades.

Can it be repaired?

Yes, to the manufacturer's or engineer's specification.

Would I see it?

Only if you were in the roof space before plaster.